Hydro container with 500 kW gas power plant – 96 positions
- Power draw up to 500 kW · cooling water (hydro)
- Shipping and installation depend on the site – included in our quote
- Lead time: depending on the project – specified in the quotation
Container enquiry
Tell us where you want to place the container and which miners you plan to put in it. We will send a quote including shipping, installation and lead time. The enquiry is non-binding.
A container that generates its own electricity: two 250 kW natural gas generators power 96 positions for water-cooled miners, and two dry coolers remove the heat. All you need is a natural gas supply – no grid connection is required.
Specifications
| Power generation | 2 × 250 kW, natural gas |
|---|---|
| Number of positions | 96 hydro miners |
| Power draw | up to 500 kW |
| Cooling | liquid (hydro), 2 micro-channel dry coolers, each rated for full load |
| Suitable miners | hydro ASICs (e.g. Antminer S19 / S21 Hyd.) – we verify compatibility |
| Warranty | 24 months |
Who it is for
- sites with gas but without a sufficient grid connection
- use of wellhead gas, biogas or otherwise unused gas
- rapid deployment of capacity off-grid
Things to consider
Operating your own power source requires permits and compliance with emission limits, which vary by country. We discuss gas consumption and permit requirements in the quote.
Price and delivery
The stated price is an indicative “from” price, excluding VAT, shipping and installation. We specify the configuration and delivery date in the quote. We handle a complete farm as part of our Turnkey farm service.