Three-phase power for ASICs: 230 V, 400 V, circuit breaker and power draw
Most Czech houses have a three-phase connection of 3 × 230/400 V with a main circuit breaker of typically 3 × 25 A. Small miners up to 1.7 kW run from an ordinary 230 V socket, air-cooled machines of around 3.5 kW need their own circuit and hydro machines of 5.5–12 kW need a three-phase 380–415 V supply. Before connecting a larger machine, always have the supply assessed by an electrician – a miner is a continuous load 24 hours a day, not a short peak like a kettle.
Summary
- A single 230 V phase with a 16 A breaker can carry about 3 kW continuously, or up to 2.9 kW with a margin.
- A 3 × 25 A household connection theoretically offers 17 kW, but for continuous load and normal household use you should count on much less.
- Bitmain hydro machines (Hyd series) are powered by three-phase 380–415 V and load all three phases evenly.
- A larger main breaker means an application to the distributor and a higher monthly capacity charge.
Which machine to connect where
| Machine power draw | Example | Power supply | Current |
|---|---|---|---|
| up to 0.5 kW | Avalon Nano 3S, Fluminer L2, VolcMiner D1 Mini | ordinary 230 V socket | up to 2.2 A |
| 0.8–1.7 kW | Avalon Mini 3, Avalon Q, Fluminer T3, Fluminer L1 Pro | 230 V socket, ideally on a separate circuit | 3.5–7.3 A |
| 2.4–4 kW | S21 Pro+, S21++, Z15 Pro, L9 | dedicated 230 V circuit (often 220–277 V) | 11–17 A |
| 5.3–6 kW | S21+ Hyd, S23 Hyd, S19 XP+ Hyd | three-phase 380–415 V | around 8–12 A per phase |
| 8–12 kW | S23e Hyd 2U, S21e XP Hyd 3U | three-phase, industrial connection | 13–18 A per phase |
Calculating the current is simple: single-phase I = P ÷ 230 V, three-phase I ≈ P ÷ (1.73 × 400 V). The exact voltage and maximum current are given in the machine's manual – for example, according to the manufacturer the Antminer S21+ Hyd needs 380–415 V and at most 12 A.
How many miners a household breaker can handle
Example for a house with a 3 × 25 A main breaker:
- The theoretical maximum is 3 × 25 A × 230 V = 17.25 kW.
- Continuous load should stay below roughly 80 % of the breaker rating, i.e. around 4.6 kW per phase.
- From this you have to subtract normal household use – cooking, water heating, the washing machine, a heat pump.
In practice, a house with a 3 × 25 A breaker can handle one hydro machine of around 6 kW, or one or two air-cooled machines of 3.5 kW each on different phases. For more machines you need a larger breaker.
What not to forget
- Phase distribution – spread single-phase machines evenly across L1, L2 and L3 so that no phase is overloaded.
- Cable cross-section and circuit breaker – an ordinary socket circuit has 2.5 mm² copper cable and a 16 A breaker. A larger machine may need a heavier cable. An electrician will decide.
- Extension leads and splitters – do not use them for a miner; continuous current heats them up.
- RCD and inspection – a new circuit for a miner should have an electrical inspection.
- Reserved capacity – increasing the main breaker is requested from the distributor (ČEZ Distribuce, EG.D, PREdistribuce) and raises the monthly charge. The price per kWh also depends on the tariff – see How much electricity for mining costs.
- PDU – several machines in one place are connected via a distribution board or a PDU with a breaker for each machine.
When hosting is the better choice
If the connection and inspection would cost more than a few months of hosting, or you do not want to deal with noise and heat, running the machine in a data centre makes sense. You will find a comparison in the article ASIC miner hosting: at home, in Czechia or abroad.
What next
- Checklist: how to prepare a space for an ASIC miner at home
- How to connect an ASIC miner
- ASIC miner power consumption and J/TH
Indicative information, not an electrical installation design. Have new circuits installed by a licensed electrician.
Frequently asked questions
Can I plug an ASIC miner into an ordinary socket?
How many miners can a 3×25 A breaker handle?
Does a hydro miner need 400 V?
How do I increase the main circuit breaker?