Most Czech houses have a three-phase connection of 3 × 230/400 V with a main circuit breaker of typically 3 × 25 A. Small miners up to 1.7 kW run from an ordinary 230 V socket, air-cooled machines of around 3.5 kW need their own circuit and hydro machines of 5.5–12 kW need a three-phase 380–415 V supply. Before connecting a larger machine, always have the supply assessed by an electrician – a miner is a continuous load 24 hours a day, not a short peak like a kettle.

Summary

  • A single 230 V phase with a 16 A breaker can carry about 3 kW continuously, or up to 2.9 kW with a margin.
  • A 3 × 25 A household connection theoretically offers 17 kW, but for continuous load and normal household use you should count on much less.
  • Bitmain hydro machines (Hyd series) are powered by three-phase 380–415 V and load all three phases evenly.
  • A larger main breaker means an application to the distributor and a higher monthly capacity charge.

Which machine to connect where

Machine power draw Example Power supply Current
up to 0.5 kW Avalon Nano 3S, Fluminer L2, VolcMiner D1 Mini ordinary 230 V socket up to 2.2 A
0.8–1.7 kW Avalon Mini 3, Avalon Q, Fluminer T3, Fluminer L1 Pro 230 V socket, ideally on a separate circuit 3.5–7.3 A
2.4–4 kW S21 Pro+, S21++, Z15 Pro, L9 dedicated 230 V circuit (often 220–277 V) 11–17 A
5.3–6 kW S21+ Hyd, S23 Hyd, S19 XP+ Hyd three-phase 380–415 V around 8–12 A per phase
8–12 kW S23e Hyd 2U, S21e XP Hyd 3U three-phase, industrial connection 13–18 A per phase

Calculating the current is simple: single-phase I = P ÷ 230 V, three-phase I ≈ P ÷ (1.73 × 400 V). The exact voltage and maximum current are given in the machine's manual – for example, according to the manufacturer the Antminer S21+ Hyd needs 380–415 V and at most 12 A.

How many miners a household breaker can handle

Example for a house with a 3 × 25 A main breaker:

  • The theoretical maximum is 3 × 25 A × 230 V = 17.25 kW.
  • Continuous load should stay below roughly 80 % of the breaker rating, i.e. around 4.6 kW per phase.
  • From this you have to subtract normal household use – cooking, water heating, the washing machine, a heat pump.

In practice, a house with a 3 × 25 A breaker can handle one hydro machine of around 6 kW, or one or two air-cooled machines of 3.5 kW each on different phases. For more machines you need a larger breaker.

What not to forget

  • Phase distribution – spread single-phase machines evenly across L1, L2 and L3 so that no phase is overloaded.
  • Cable cross-section and circuit breaker – an ordinary socket circuit has 2.5 mm² copper cable and a 16 A breaker. A larger machine may need a heavier cable. An electrician will decide.
  • Extension leads and splitters – do not use them for a miner; continuous current heats them up.
  • RCD and inspection – a new circuit for a miner should have an electrical inspection.
  • Reserved capacity – increasing the main breaker is requested from the distributor (ČEZ Distribuce, EG.D, PREdistribuce) and raises the monthly charge. The price per kWh also depends on the tariff – see How much electricity for mining costs.
  • PDU – several machines in one place are connected via a distribution board or a PDU with a breaker for each machine.

When hosting is the better choice

If the connection and inspection would cost more than a few months of hosting, or you do not want to deal with noise and heat, running the machine in a data centre makes sense. You will find a comparison in the article ASIC miner hosting: at home, in Czechia or abroad.

What next

Indicative information, not an electrical installation design. Have new circuits installed by a licensed electrician.

Frequently asked questions

Can I plug an ASIC miner into an ordinary socket?
Small miners up to 1.7 kW, yes, ideally on a separate circuit. Air-cooled machines of around 3.5 kW need their own circuit, and hydro machines need a three-phase 380–415 V supply.
How many miners can a 3×25 A breaker handle?
In practice one hydro machine of around 6 kW, or one or two air-cooled machines of 3.5 kW each on different phases, depending on the household's normal consumption. Keep continuous load below roughly 80 % of the breaker rating.
Does a hydro miner need 400 V?
Yes, Bitmain Hyd series hydro machines are powered by three-phase 380–415 V. For example, according to the manufacturer the S21+ Hyd draws at most 12 A per phase.
How do I increase the main circuit breaker?
By applying to the distributor (ČEZ Distribuce, EG.D or PREdistribuce). A larger breaker raises the monthly capacity charge and often requires an electrician to modify the connection.